Home Incinerator Manufacturing | Northamps ENV Solution, Kerala

Solid Waste Management

Solid Waste Management

Incineration is one of the solid waste management methods. Incineration is a waste treatment process that involves the combustion of organic substances contained in waste materials. Incineration and other high-temperature waste treatment systems are described as “thermal treatment”. Incineration of waste materials converts the waste into ash, flue gas and heat. The ash is mostly formed by the inorganic constituents of the waste, and may take the form of solid lumps or particulates carried by the flue gas. The flue gases must be cleaned of gaseous and particulate pollutants before they are dispersed into the atmosphere. In some cases, the heat generated by incineration can be used to generate electric power.

Features

  • Continuous air-jet synchronous draft technology for clean efficient combustion
  • Enclosed chamber with curved acidic refractory bricks for heat retention
  • Fully insulated system for efficiency and operator safety
  • One year warranty
  • We provide water scrubber system for reducing atmospheric pollutions.

Specifications

  • Foundation with required diameter and 15 cm thickness.
  • 2. Inside coated fire brick on the ash collection area and combustion chamber lined with 3 inch furnace bricks for 10-30Kg incinerators and 4 inch furnace bricks for 40-90Kg and outside body with MS sheet coated with high grade HR paint.
  • Top conical part coated with high quality furnace material
  • Separation between combustion chamber and ash collection area provided with SS 304 grade grill.
  • Smoke line 3metre length SS 304 grade pipeline.

Operation of Incinerator

The fuel free solid waste dispenser with the unique CORT (Controlled Oxygen Rotating Technology) turns any solid waste material permitted to be incinerated into pure ash within minutes adhering to relevant emission standards.

Within 3 to 4 minutes, the temperature inside the closed chamber reaches very high depending upon the nature of the waste material. The high quality steel chimney which can stand up to a temperature of 700 degree centigrade makes it lasting.

Fuel free incinerator is an eco-friendly and economic solution for inert disposals which runs on the principle of incineration while addressing and solving the major drawbacks of conventional incinerators like a) Use of Fuel and Resultant Environmental Impacts b) High Initial Investment c) Recurring Costs d) Extensive Space.

It works on Controlled Oxygen Rotating Technology incinerates solid waste by combustion using atmospheric Oxygen, convert it into ash, heat, steam, and gas causing minimal environmental impact. Manufacturing cost is comparatively very low, the fuel free operation avoids recurring costs, and the compactness ensures minimum space for installation.

Terms & Conditions

  • Prices are inclusive of transportation and installation at site.
  • Erection & commissioning shall be done by the company and are included in the price.
  • One year on-site warranty for all parts with free maintenance and thereafter AMC is offered for the equipment.
  • Union loading charges, if any, will be charged extra as actuals.
  • Standard height specified is part of the manufacturer’s design for the equipment.
  • Any additional work comes other than the above mentioned will come under the client scope. All Plumbing works including water pipes, connections, etc comes under client scope.

Estimated Cost of the Product

DescriptionChamber Size in mmBurning CapacityChimney SizePipe lineRATE in Rs.Tax (18% GST)Total
10 apartment500 x 1250 10 kg3 metre 6’’46017 828354300
20 apartment 600 x 1250 20 kg3 metre 6’’60339 1086171200
30 apartment700 x 1250 30 kg3 metre 6’’7440613393 87799
40 apartment800 x 1250 40 kg3 metre8’’9694917450 114400
50 apartment1000 x 1250 50 kg3 metre8’’11135620044 131400
60 apartment1200 x 1250 60 kg 3 metre8’’13000023400 153400
70 apartment1400 x 1250 70 kg 3 metre10’’15720428297 185501
80 apartment1600 x 1250 80 kg 3 metre10’’17669531805 208500
90 apartment1600 x 1500 90kg 3 metre10’’19533935161 230500
100 apartment1700 x 1500 100 kg 3 metre12’’21487338677 253550
110 apartment1800 x 1500 110 kg 3 metre12’’23636042545 278905
120 apartment1900 x 1500 120 kg 3 metre12’’25763346374 304007
130 apartment2000 x 1500 130 kg 3 metre12’’28082050548 331368
140 apartment2100 x 1500 140 kg 3 metre12’’30328754591 357878
150 apartment2200 x 1500 150 kg 3 metre12’’32754958959 386508

Testimonials

“ The solid waste management of staff quarters at Muttom by collection,segregation and disposal of wastes with non biodegrdable method by installation, testing ,commissioning and maintenance of biobins aerobic composting method and fuel free incinerator was completed successfully. The quality of workmanship, planning and execution of the work was good. ”

 

General Manager (projects), Kochi Metro Rail Ltd

 

“ Northamps ENV Solution service provider for Suchitwa Mission is extending their support for planning, preperation, execution and implementation of local self Government Institutions and corporates on Waste Management…. ”

Siju Thomas –

District Coordinator, Jilla Suchitwa Mission, Ernakulam

Top